(Reuters) – Eastbound gas flows resumed on Sunday via the Yamal-Europe pipeline to Poland from Germany after a brief halt, data from pipeline operator Gascade showed.
Exit flows at the Mallnow metering point on the German border were at 668,924 kilowatt-hours per hour (kWh/h) between 1700-1800 CET after remaining zero since 0600 CET, data showed.
Flows stood at 665,593 kWh/h on Monday between 0200-0300 CET.
(Reporting by Ashitha Shivaprasad in Bengaluru; Editing by Himani Sarkar)